ABB CoreSense M10 Installation Manual page 54

Multi-gas monitoring system
Hide thumbs Also See for CoreSense M10:
Table of Contents

Advertisement

NOTICE
Once the installation is complete, it is strongly suggested to use tie wraps (in white on
Figure 35) to secure the cables to the cable guides.
Remove the protection rail top cover and continue routing the wire through the upper protection rail
all the way to the appropriate terminal, as illustrated in Figure 35.
Figure 36 Routing the mains power cable to the terminal block (sensor head AC cable not shown, for clarity)
Protection
rail top cover
2 Connect each wire in the appropriate terminal, as shown below.
Figure 37 Connecting the mains power AC cable (sensor head AC cable not shown, for clarity)
54
Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents