A p p E N D I X A

Physical installation checklist

□ The system date is set properly using the CoreSense™ M10 web interface.
□ The thermal pump is enabled (see "Activating the thermal pump" on page 69). While the thermal
pump is disabled, the SYSTEM LED is yellow.
□ Visual inspection of the installation (oil leaks).
□ Cable glands are tight and secure.
□ The sensor head and analytical unit are properly grounded.
□ Teflon (PTFE) tape was applied on the 1.5 NPT fitting, as per "Installing the sensor head" on
page 35?
□ The proper torque was applied to secure the eight bolts on the sensor head rotating flange, as
described in "Installing the sensor head" on page 35.
□ The two bolts for the sensor head external sampling cover are secure.
□ The five retaining screws of the CoreSense enclosure are properly secured.
□ The SYSTEM, GAS, and MOISTURE LEDs are green at the back of the sensor head.
□ The green LED is lit on the analysis unit.
□ Dispose of any collected oil according to company regulations and local laws.