Fixing Down
Do not fix down unless the staging has been installed!
If you are happy with the position of the building and your door
opens and closes well you can fix the building down. You need
at least one fixing per base bracket (supplied), if the building is
exposed to high winds it would be a good idea to use 2 fixings
per bracket (not supplied).
Drill through the bracket with a 7mm masonry drill, plug the
hole with a brown rawl plug and fix with a 50mm screw
(diagram 133).
Glazing Bar
EV1001M
Diagram 133
Internal
19
57
Need help?
Do you have a question about the Evolution octagonal and is the answer not in the manual?