Side Assembly
Right of Door
Diagram 10
You now need to build the side
assemblies either side of the
door. First build the assembly
Dia. 11
X 1
to the right of the door, take an
eaves bar with the cast eaves
brackets attached and fix a
standard side glazing bar in
the right hand eaves bracket.
Now take the glazing bar with a
wedge shape on the left side
(EV0968) and fix that to the left
hand eaves bracket (diagram
11). Again drill pilot holes and
fix
using
50mm
screws.
Remember not to over tighten
these screws.
With the side glazing bars
attached you can now insert
the mid rail.
This is slightly
different to the other mid rail
as it is shaped to be positioned
next to the door (EV0960). Drill
External
Diagram 11
a pilot hole through the side of
the glazing bars and fix with an
80mm screw (diagram 12 & 13).
As before just slot the cill
Dia. 13
Dia. 12
section (EV0950) into place
without any fixings (diagram 9).
Diagram 13
Diagram 12
External
Internal
4
9
Need help?
Do you have a question about the Evolution octagonal and is the answer not in the manual?
Questions and answers