Alton Evolution octagonal Instruction Manual page 30

Hide thumbs Also See for Evolution octagonal:
Table of Contents

Advertisement

High Level Louvre Installation
To fit the louvre assembly in the high level position you place the EV795X392 glass under the louvre
frame. This should be held in place while the louvre frame is fixed in position. Drill a pilot hole
through the top rail of the louvre frame and secure to the eaves rail with a 50mm screw (Diagram 60).
Diagram 61
External
X-ray
Next, drill a pilot hole through the glazing bar
(diagram 61), diagram 62 shows the ideal angle
Diagram 60
of the screw. Make sure the rebate for the glass
lines up with the front of the glazing bar.
Diagram 62
30
Dia. 60
EV795X392
Dia. 61
Diagram 59
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution octagonal and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Evolution octagonal

Table of Contents