Alton Evolution octagonal Instruction Manual page 48

Hide thumbs Also See for Evolution octagonal:
Table of Contents

Advertisement

Staging Installation
You can now start to install the staging slats. Each slat needs 4 x 10mm bolt (HE576) sliding down
the bolt channel on the underside. Its easiest to lay the slat topside down to do this, then turn it over
to position it. The two bolts closest to the ends locate with the holes in the staging arms (diagram
109). The longest slat (EV1111M) nearest to the middle of the greenhouse needs 5 x 10mm bolts.
Internal
Dia. 109
Internal
Internal
16
EV1114M
Diagram 109
EV1114M
The ends of the slats should line up with
the staging arm, if they don't then this
suggests the building is out of square. Try
adjusting the position of the base until the
slats line up.
EV1114M
EV1113M
EV1112M
EV1111M
48
Diagram 108
Diagram 110

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution octagonal and is the answer not in the manual?

This manual is also suitable for:

Evolution octagonal

Table of Contents