Staging Installation
You now need to bolt the internal arm (EV1120M) onto the underside of the slats (diagram 111). This
uses the extra bolts you inserted earlier. Loosely fit the nuts for now. Before attaching the internal
arm to the longest slat you also need to attach the diagonal support (EV0350M) to the same bolt.
Line the ends of the internal arm up with the front edge of the staging (diagram 112a) and with the
outer staging arm at the rear (diagram 112b), once happy with the position tighten all the nuts.
The extra bolt in the longest slat should be left towards the rear of the building as this is used to
connect the next section of staging (shown by the arrow in diagram 111).
Diagram 111
Internal
Dia. 112a
Dia. 112b
Diagram 113
Internal
Dia. 113
Using a level make sure the staging is flat and
level before fixing the diagonal support in place
with a large head 25mm screw (diagram 113).
Repeat this installation for the other side of the
Diagram 112a
Internal
greenhouse.
Diagram 112b