Summary of Contents for Alton Evolution Internal Shading
Page 2
Internal Shading Installation To install the internal shading blinds to your Alton Evolution greenhouse you will need to temporarily remove the ridge braces. With the braces removed you will be able to position the roller blind parallel to the underside of the ridge (diagram 1). Fix this in place with round head screws.
Page 3
Internal Shading Installation Now fit the universal hooks to the Diagram 4 underside of the roof glazing bars (diagram 5). These fit neatly side by side if you have multiple blinds (diagram 6). The hook that is fixed to the gable end is in a slightly different position due to the bigger section (diagram 7).
Need help?
Do you have a question about the Evolution Internal Shading and is the answer not in the manual?
Questions and answers