IBM BladeCenter HS21 Series Problem Determination And Service Manual page 105

Hide thumbs Also See for BladeCenter HS21 Series:
Table of Contents

Advertisement

The following illustration shows the locations of the DIMM sockets on the system
board.
The following illustration shows the locations of the DIMM sockets on the optional
IBM BladeCenter Memory and I/O Expansion Blade.
To install a DIMM, complete the following steps.
1. Read the documentation that comes with the DIMM.
2. Locate the DIMM connectors. Determine the connectors into which you will
install the DIMMs.
3. Touch the static-protective package that contains the DIMM to any unpainted
metal surface on the BladeCenter unit or any unpainted metal surface on any
other grounded rack component; then, remove the DIMM from the package.
DIMM 4 (J144)
DIMM 3 (J143)
DIMM 2 (J142)
DIMM 1 (J141)
DIMM
Retaining clip
Chapter 4. Removing and replacing blade server components
DIMM 8 (J19)
DIMM 7 (J18)
DIMM 6 (J21)
DIMM 5 (J20)
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladecenter hs21 1885Bladecenter hs21 8853

Table of Contents