Oracle X8-8 Installation Manual page 132

Table of Contents

Advertisement

Index
configure, 92
rail assembly, 41
remote ethernet connection, 76
requirements
electrical, 18
environmental, 15
maintenance space, 14
rack space, 14
tools and equipment, 21
resetting the server, 111
resetting the service processor
with Oracle ILOM, 87
RJ-45 cable, 57
root account password, recover, 87
S
safety checklist, 126
safety precautions, 42
Secure Shell (SSH) command-line interface, 74
SER MGT port
pinouts, 60
server
components, 25
management tools, 37, 37
physical specifications, 13
power on and off with On/Standby button, 109
power on and off with Oracle ILOM, 109
preparing for installation, 13
resetting with Oracle ILOM, 111
server weight, 43
service processor
resetting using Oracle ILOM, 87
troubleshooting, 86
service processor network settings, 78
using Oracle ILOM, 78
shipping inventory contents, 21
shipping inventory, checking for damage, 21
single server management tools, 37
site planning checklist
access route, 123
Auto Service Request, 127
data center environment, 124
132
Oracle Server X8-8 Installation Guide • June 2019
facility power, 125
logistics, 127
rackmount, 125
safety, 126
site planning checklists, 123
SMOD
back panel, 29
LEDs, 31, 34
SNMP v3 interface, 74
software release packages, 114
space requirements
server
back, 14
front, 14
specifications
agency compliance, 20
electrical, 18
environmental, 15
physical, 13
Standby power mode, 107
standby power mode, when AC connected, 57
status indicators (LEDs), 25
storage
configuration, 89
storage drives, 25
storage drives, location
back panel, 35
support worksheet, 120
system status indicators
front panel, 28
T
temperature guidelines, 16
tools and equipment, needed for server installation, 21
troubleshooting, 119, 119
service processor, 86
service processor connection, 86
U
Unified Extensible Firmware Interface (UEFI)
boot mode, 92

Advertisement

Table of Contents
loading

Table of Contents