Callout Description
1
2
3
4
5
6
2.
Open the top of the box.
Cut the straps.
a.
b.
Cut or remove the tape.
c.
Open the flaps.
3.
Remove the tray and set it aside.
Lift the box up and away from the server.
4.
5.
Remove the foam inserts.
Fold the corrugated flap down to release the front foam insert.
a.
b.
Remove the front and back inserts.
Unwrap the antistatic wrapper from the server.
6.
7.
To remove the server from the pallet, insert the blades of the lift in the gap
between the server and the pallet.
For rack mounting instructions, see
"Install Shelf Rails and Back Mounting Brackets" on page 50
Next Steps
■
Rackmount Kit Contents
The following figure shows the contents of the Rackmount Kit.
Rackmounting kit. See
"Rackmount Kit Contents" on page
Tray
Box
Foam inserts
Server
Pallet
47.
"Rackmounting the Server" on page
Rackmount Kit Contents
49.
Installing the Server Into a Rack
47
Need help?
Do you have a question about the X8-8 and is the answer not in the manual?