Multiple Connections; Cover; Double Configuration Installation (M30) - FAAC J275 2K HA Manual

Table of Contents

Advertisement

MULTIPLE CONNECTIONS

If multiple bollards (max 3) are installed, which are controlled by a
single JE275 board, connect the coils in parallel as indicated in the
following diagram.
1
2
S
S
If multiple bollards (more than 3) are installed, which are controlled
by JE275 boards in a master / slave configuration, connect the coils to
the inputs of the relative control board (master or slave) as indicated
in the following diagram.
Master JE275 board
1
2
S
S
Slave JE275 board
4
5
S
S
 1 Double confi guration installation (M30)
Make a hole as in indicated below in order to obtain a class M30 break-in resistance.
J275 2K HA
MOT2
COM
3
MOT1
FAN
S
COM
COM
LAMP
4 3
MOT2
COM
3
MOT1
FAN
S
COM
COM
LAMP
MOT2
COM
6
MOT1
FAN
S
COM
COM
LAMP
4 4

7.3 COVER

Use the cover to make the pit of the bollard, which has not yet been
installed, safe (e.g. while the concrete is drying). Fasten the cover
to the subframe using 4 of the 10 M12x30 screws supplied with the
bollard.
23
3500
≤1200
532208 - Rev.A
 4 5
 4 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents