4. INSTALLATION

4.1 MAKING THE HOLE

!
There must be no chance of water accumulating in the installation
area. The ground must have a good drainage capacity.
If the bollard has to be installed in an area in which water accumulates,
protect it by surrounding it with a drainage channel with a cover grille.
1. Make the hole according to the measurements indicated in  5 .
2. Test the drainage capacity of the ground by pouring approximately
40 litres of water into the hole, making sure that it drains in less
than 30 minutes. If it takes longer, drain rainwater by installing
a Ø 60mm pipe connected to the drainage system or a pit. The
pit must be fitted with an emptying system (e.g. an electric pump)
that is deeper than the catch basin that collects and discharges
the rainwater.
Ground
J275 2K HA
1000
1000
Excavation
 5

4.2 ASSEMBLING THE PIT

Assemble the pit as indicated in  6 (all the materials are supplied):
1. Assemble the base 2 with the side modules 3 using the rivets
1. The module with the hole 4 must be used in the top part of
the pit.
2. Fix the subframe to the walls using the screws and relative nuts 5.
Keep the four M12 nuts 6 for assembling the pit with the cage §2.3.
The anchors 7 are not used
4
3
2
x4
6
9
5
5
1
1
x4
7
 6
532208 - Rev.A