9. Remove the eyebolts and fasten the bollard to the pit using the
ten M12x30 screws.
10. Fasten the cover to the frame using the eight M6x10 screws.
To reposition or lift the cover, prise one of the two slots upwards using
a screwdriver.
J275 2K HA

4.6 MANUAL OPERATION

!
Before carrying out the release procedure, disconnect the power supply
to the automation system.

RELEASE PROCEDURE

45 Nm
1.  18 Remove the plugs 1 and unscrew the screws 2.
10
2. Unscrew the plug 3.
16
5
3.  1 9 Insert the key 1 and turn it anticlockwise until it stops 2.
17
13
1
T30
3
2
1
2
532208 - Rev.A
8
 1 8
 1 9