Je275 Control Unit; Electrical Connections; Pre-Setting Selection - FAAC J355HA M30-P1 User Manual

Bollard
Table of Contents

Advertisement

3. JE275 CONTROL UNIT

!
Always cut the power supply before performing any intervention on the control unit (connections, maintenance).
Install a differential thermal-magnetic switch with suitable threshold (0.03A) upstream of the system.
Connect the earth cable to the relevant terminal on the connector J9 of the unit (see figure below).
Ensure that the grid disconnect switch has a lock key, unless it is installed in view of the operator/maintenance technician.
The equipment must be laid at a height ranging between 0.4 m and 2.0 m.

3.1 ELECTRICAL CONNECTIONS

JE275 BOARD SIDE
MOT2
{
Motor 1
COM
Motor 2
MOT1
FAN
COM
COM
LAMP
J2
GND
OUT 4
OUT 3
OUT 3
O
O
O
O
O
O
O
O
O
O
Lights
OUT 2
OUT 1
+
+
+24 V
+
+24V
+24 V
GND
GND
EMERGENCY
STOP
FSW
CLOSE
OPEN A
LOOP 2
LOOP 2
LOOP 1
LOOP 1
J1
EFO N.O. connection
Solenoid valve

3.2 PRE-SETTING SELECTION

After having connected the board and after having supplied it with power according to the previous
paragraph, you must select the work pre-setting for the bollard J355 M30-P1 following the operations
below:
st
1. Enter the 1
level programming, holding down key F on the board. The initials dF will appear on
the display
2. Release the F key and select 06 with the key +
3. Simultaneously press keys F and - to exit programming and save the changes performed.
For any further information on the unit programming, please refer to the relevant instructions.
J355HA M30-P1
230V~ 50Hz
J9
C1/C2
20μF
400V
EFO pressure
switch
Limit switch UP
J5
J3
Limit switch
DOWN
230V ~
BOLLARD SIDE
M2
M1
Solenoid valve
Heater
(optional)
EFO N.C. connection (only voluntary activation)
Solenoid valve
13
Motor - Brown
Motor - Blue
Motor - Black
Refer to the diagram below
230 V ~
230 V ~
+24V
Lights
Limit switch UP
Limit switch DOWN
Limit switch common
230V ~
13
732768 - Rev.C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents