Equipment Included In The Package - Cisco CiscoWorks WLSE 1130-19 Installation And Configuration Manual

Wireless lan solution engine
Table of Contents

Advertisement

Chapter 1
Product Overview
Warning
Network Cable Requirements
Note

Equipment Included in the Package

78-16778-01
To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits
to telephone-network voltage (TNV) circuits. LAN ports contain SELV circuits,
and WAN ports contain TNV circuits. Some LAN and WAN ports both use RJ-45
connectors. Use caution when connecting cables. Statement 1021
The Ethernet connectors are designed for attaching an unshielded twisted pair
(UTP) Ethernet cable equipped with standard RJ-45 compatible plugs. Press one
end of the UTP cable into the Ethernet connector until the plug snaps securely into
place. Connect the other end of the cable to an RJ-45 jack wall plate or to an RJ-45
port on a UTP concentrator or hub, depending on your network configuration.
Observe the following cabling restrictions for 10BASE-T, 100BASE-TX, and
1000BASE-T networks:
For 10BASE-T networks, use Category 3 or greater wiring and connectors.
For 100BASE-TX and 1000 BASE-T networks, use Category 5 or greater
wiring and connectors.
The maximum cable run length (from a workstation to a concentrator) is 328
feet (ft) or 100 meters (m).
For 10BASE-T networks, the maximum number of daisy-chained
concentrators on one network segment is four.
To avoid line interference, put voice and data lines in separate sheaths.
The WLSE package should include the following:
WLSE 1130-19
Rack mounting kit. (Your rack mounting kit may be different from the one
described in this document.)
Power cable
Serial cable (light blue, RJ-45 to RJ-45)
Installation and Configuration Guide for the CiscoWorks Wireless LAN Solution Engine
Equipment Included in the Package
1-7

Advertisement

Table of Contents
loading

Table of Contents