Assembling The Cascade Mounting Rack; Installation And Configuration Of Cascade Systems - ACV Prestige 24 Solo Installer's Handbook

Heating systems controlled with acvmax
Table of Contents

Advertisement

EN

INSTALLATION AND CONFIGURATION OF CASCADE SYSTEMS

ASSEMBLING THE CASCADE MOUNTING RACK

The steps in the following procedures are indicated by black circles with a white number (
FR
NL
ES
2 boilers
IT
1. Mounting the feet
Required material
DE
Procedure (x2 for each foot)
PL
RU
2
1
en
3-12
3 boilers
4 boilers
3
5
2. Mounting the vertical profiles and connecting them to the feet
).
1
Required material
Procedure (x3 for the configuration on the left)
1/4
turn
1
4
The Installer's Handbook - ACVMax: A1004308 - 660Y2900 - Volume 3 • B
2
4
3
Min 2 cm from
back end of foot
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents