3 Installation design and start-up

This section describes the necessary steps to design and start up the installation. Proceed as
follows:

1. Electrical wiring design of the installation.

2. Electrical connection of the INGECON SUN STORAGE 1Play.
3. Configuration of the INGECON SUN STORAGE 1Play.
4. Updating firmware.
5. Monitoring of the installation.
3.1 Electrical wiring design of the installation
The design of the installation must be carried out according to the electrical
scheme defined by Ingeteam. The wiring diagrams can be found in the following
link:
http://www.ingeconsuntraining.info/?page_id=13044
Installation components:
Photovoltaic panels.
Battery bank.
INGECON SUN STORAGE 1Play.
Manual bypass switch (optional). In the event of an ISS 1Play fault or maintenance, this
allows for the loads to be powered from the grid. It is formed by 2 independent
interlocking manual switches that connect alternately.
Neutral to ground contactor for installations with neutral TT system. If the back-up
function is activated in the event of a power cut, the ISS 1Play disconnects from the grid
and actives this contactor to reference the neutral of the ground installation. In the case
of installations with a TN neutral system, this contactor does not have to be installed.
Manual bypass switch
Neutral ground
connection
contactor
Ingeteam
Control signal
Optional

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents