Installation And Operation; Unpacking And Inspection; Wiring Terminal View - Njoy Garun Series User Manual

3 phase in / 3 phase out ups
Hide thumbs Also See for Garun Series:
Table of Contents

Advertisement

2

Installation and operation

2.1. Unpacking and inspection

Unpack the package and check the package contents. The shipping package
should contain:
• One UPS
• One user manual
• One monitoring software CD
• One RS-232 cable (option)
• One USB cable
• One parallel cable (only available for parallel model)
• One shared current cable (only available for parallel model)
NOTE!
Before the installation, please inspect the unit. Be sure that there is no physical
damage to the unit. Do not turn on the unit and notify the carrier and dealer
immediately if there is any damage or missing parts and accessories. Please keep
the original packaging for future use. It is recommended to keep each equipment
and battery set in their original packaging because they have been designed to
provide maximum protection during transportation and storage.

2.2. Wiring terminal view

1
RS-232 communication port
2
USB communication port
3
Emergency power off function connector (EPO connector)
4
Share current port (only available for parallel model)
5
Parallel port (only available for parallel model)
6
Intelligent slot
7
External battery connector/terminal (Only available for long-run model)
8
Line input circuit breaker/switch
9
Maintenance bypass switch (option)
10
Input/Output terminal (Refer to diagram 2, 5 and 8 for the details)
11
Line input terminal
12
Output terminal
13
Input grounding terminal
14
Output grounding terminal
15
Bypass input circuit breaker/switch
16
Bypass input terminal
17
Grounding terminal
18
Output switch
8
Diagram 1: Garun 10KL, 15KL, 20KL
Dual Rear panel
Diagram 2: Garun 10KL, 15KL, 20KL
Dual Input / Output terminal
9

Advertisement

Table of Contents
loading

Table of Contents