Reporting And Monitoring Installation Data - SolarEdge SE5000H-AU Installation Manual

Ev charging single phase inverter with setapp configuration
Table of Contents

Advertisement

49
  Reporting and Monitoring Installation Data
EV Charging Status
When the EV charger is activated, this screen displays the EV charging status ,
according to the charging mode.
Today
45 kWh
Total 41.03 MWh
Car
Charging
Energy Added 163 Wh
EV / Car Status: Connected / Disconnected / Charging
Charger: Charging power x.xkW / Ready / Initializing
Energy Added: 0 - 999 kWh added to the EV battery.
After disconnecting the EV charger the last charged energy is displayed.

Reporting and Monitoring Installation Data

NOTE
Monitoring the site requires connecting the inverter to the monitoring
platform, using any of the wired or wireless options available from SolarEdge.
Refer to Setting Up Communication to the Monitoring Platform on page 52.
The Monitoring Platform
The monitoring platform provides enhanced PV performance monitoring and yield
assurance through immediate fault detection and alerts at the panel, string and system
level.
Status
Inverter Energy
This Month
This Year
13.68 Wh
1.14 Wh
EV Charger
Charger
3.81 kW
EV Charging Single Phase Inverter MAN-01-00629-1.2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents