Chapter 2: Installing the Power Optimisers

Safety

The following notes and warnings apply when installing the power optimisers. Some of
the following may not be applicable to smart panels:
WARNING!
When modifying an existing installation, turn OFF the inverter ON/OFF/P
switch, the Safety Switch (if applicable) and the AC circuit breaker on the main
AC distribution panel.
CAUTION!
Power optimisers are IP68/NEMA6P rated. Choose a mounting location where
optimisers will not be submerged in water.
CAUTION!
This unit must be operated according to the operating specifications provided
with the unit.
CAUTION!
Cutting the power optimiser input or output cable connector is prohibited and
will void the warranty.
CAUTION!
All PV panels must be connected to a power optimiser. 
CAUTION!
If you intend to mount the optimisers directly to the panelor panele frame, first
consult the panel manufacturer for guidance regarding the mounting location
and the impact, if any, on panel warranty. Drilling holes in the panel frame
should be done according to the panel manufacturer instructions.
EV Charging Single Phase Inverter MAN-01-00629-1.2