SolarEdge SE5000H-AU Installation Manual page 63

Ev charging single phase inverter with setapp configuration
Table of Contents

Advertisement

Chapter 6: Setting Up Communication to the Monitoring Platform
    62
 6. To check the slave IDs and last communication time, select RS4852 è Slave List.
 7. Verify the connection of the master to the monitoring platform, as described in the
next section.
EV Charging Single Phase Inverter MAN-01-00629-1.2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents