21
Step 2: Connecting Power Optimisers in Strings
3. If you intend to monitor the installation, using the monitoring platform, record the
physical location of each power optimiser, as described in Creating Logical and
Physical Layout using Installation Information on page 50.
EV Charging Single Phase Inverter MAN-01-00629-1.2