Installation Instructions - Dexter Laundry B Series Operators Manual Installation & Operation Instructions

Industrial, on-premise control, electric-heated
Hide thumbs Also See for B Series:
Table of Contents

Advertisement

UNCRATING AND PLACING DRYER
Tools Required: 3/4" (19 mm) hex socket & ratchet driver, wood block 4" (100 mm) or 5" (125 mm) thick, a knife
and a groove joint pliers, which will open to 1 3/8" (35 mm).
1. Remove and discard packaging.
2. The crate base is attached to the dryer by (4) cap screws driven upward from below the crate base. Remove
crate base from dryer, by tipping dryer sidewise and place block under crate base rail in center of dryer.
Using a ratchet and 3/4" hex socket, remove and discard (2) crating bolts from side, which is raised.
Remove block from under crate base. Repeat for other side. Save the bolts for use if the dryer is ever
moved again.
3. With a walking motion move dryer completely off crate base. Save the crate base for use if the dryer is
ever moved again.
4. Slide unit into position where it will be installed. Adjust leveling legs, using the groove joint pliers, to level and
align dryer with adjacent units.
Note: If the dryer is ever moved again, the dryer should be re-mounted on its crate base and its crating bolts re-
inserted and tightened, in the reverse order as above.
DRYER INSTALLATION
1. CODE CONFORMITY: All commercial dryer installations must conform to the local and national codes for
the location of installation.
2. INSTALLATION CLEARANCES: This unit may be installed at the following alcove clearances:
I. Left Side
II. Right Side
III. Back
IV. Front
V. Top
VI. Floor
Do not obstruct the flow of combustion and ventilation air.
Maintain minimum of 1" (25 mm) clearance between duct and combustible material.
Refer to the label attached to the Belt Guard on the rear of the dryer for other installation information and
start-up instructions.
8514-265-001 REV C PAGE 12

INSTALLATION INSTRUCTIONS

0"
0"
18" (457 mm) (Certified for 6" (150 mm) clearance; however, 18" (457 mm) clearance is
necessary behind the motors to allow servicing and maintenance.)
48" (1220 mm) (to allow use of dryer)
Refer to figure labeled "Vertical Clearance Dimensions".
AB. Certification allows 0" clearance at the top 4" (100 mm) back from the front.
However, a 1/4" (6 mm) clearance should be allowed in case the dryer needs to be
moved.
C. A 10" (250 mm) clearance is required from top at all other points.
If used as a stand-alone dryer, this unit is intended to be installed upon an elevated
surface. The surface must be of suitable strength to support 450 pounds (205 kg),
and the dryer should be bolted or anchored to prevent horizontal movement. This
unit may be installed upon a combustible floor.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-30x2T-20x2

Table of Contents