RGBlink X3p User Manual page 5

Hide thumbs Also See for X3p:
Table of Contents

Advertisement

The AC Socket-outlet should be installed near the equipment and be easily accessible.
Unpacking and Inspection
Before opening X3p processor shipping box, inspect it for damage. If you find any damage,
notify the shipping carrier immediately for all claims adjustments. As you open the box, compare
its contents against the packing slip. If you find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and checked that all the listed
components are present, visually inspect the system to ensure there was no damage during
shipping. If there is damage, notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your X3p should be clean, properly lit, free from static,
and have adequate power, ventilation, and space for all components.
X3p
User Manual
4

Advertisement

Table of Contents
loading

Table of Contents