2
Recommended sequence of operations
•
Carefully select the location for the
head, following the configuration sheet
provided and precautions given in
section 3
•
Select the location for the Processor,
bearing in mind the precautions given
in section 8
•
Select the locations for any optional
items, bearing in mind the precautions
given in section 6
Disconnect the machine's main power prior to installation
DO NOT connect or disconnect any cables when the system is
Any damage caused by the above will not be covered under
23/04/2019
'powered up'
warranty
•
9/71