Routing the sensor head cables

When installing cables on the machine, start from the Head working
towards the Processor. Do not remove the protective cap fitted to the
plug before routing it. Cable tie the plug in a plastic bag when routing
it through the machine to stop ingress of dirt, oil, etc.
Cables must be protected by cable glands when routed through a
partition.
Follow existing cables routes as far as possible.
Cables should never be routed in contact or near heat sources
Cables should never pass in front of hatches or openings
23/04/2019
(e.g. exhaust pipe, radiator, etc.).