Testing - Faema E71 E Engineer's Manual

Hide thumbs Also See for E71 E:
Table of Contents

Advertisement

1
Press the icon
.
instant boiler
temperature
boiler
pressure
boiler
resistance
Boiler activation percentage: Modulation percentage of the heating power of the boiler.
Boiler resistance: Activation of resistance elements on the basis of the power selected.
Total power divided into: RC1 = ⅔ - RC2 = ⅓
Full power cycle: RC1 ON / RC2 ON Low power cycle: RC1 ON / RC2 OFF
RC1 OFF / RC2 OFF RC1 OFF / RC2 OFF

Testing

6. Testing
2
Testing
Volumetric meter
incremental counter
Testing
The selection of the parts to be moved is done by pressing the icons
; the operation takes place by pushing the button which indicates the name of
the part.
Here is the table of symbols used to define the moving parts that can be
accessed:
MP
Pump motor
G1÷G3
Coffee dispensing solenoid valves
Eac
Hot water solenoid valve
Cold water solenoid valve
Eaf
Eav
Steam water solenoid
Evc
Boiler load solenoid valve
Pressure-reset solenoid valve
Em
Ein1÷Ein3 Pre-infusion solenoid valve
17 EN
The test screen permits manual operation
of the components in the machine.
boiler activation
percentage
level signal;
level in boiler
tested part
Boiler load solenoid
valve
water
and

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents