Performance Verification Tests

Use the performance verification tests to verify the measurement performance of
the instrument. The performance verification tests use the instrument's
specifications listed in the U1190A Series User's Guide (available for download at
www.keysight.com/find/hhTechLib).
The performance verification tests are recommended as acceptance tests when
you first receive the instrument. The acceptance test results should be compared
against the one-year test limits. After acceptance, you should repeat the
performance verification tests at every calibration interval.
If the clamp meter fails the performance verification tests, adjustment or repair is
required.
Ensure that you have read the
NOTE
the performance verification tests.
Table 1-5

Performance verification tests

Step Test function
ACA
1
Turn the
rotary switch to the
position.
DCA
2
Turn the
rotary switch to the
position,
and press the
until
is shown on the
display.
Keysight U1190A Series Service Guide
Fluke 5520
Range
output
60 A
1.2 A, 45 Hz
1.2 A, 400 Hz
400 A
8 A, 45 Hz
8 A, 400 Hz
600 A
12 A, 45 Hz
12 A, 100 Hz
60 A
1.2 A
600 A
12 A
key
"Test Considerations"
Reference
values
U1191A
60 A, 45 Hz
-
60 A, 400 Hz
-
400 A, 45 Hz
±8.5 A
400 A, 400 Hz
±12.5 A
600 A, 45 Hz
-
600 A, 100 Hz
-
60 A
-
600 A
-
Calibration Procedures
on page 24 before running
Error from nominal 1 year
U1192A
U1193A
±1.25 A
±1.25 A
±1.85 A
±1.85 A
±8.5 A
-
±12.5 A
-
-
±12.5 A
-
±18.5 A
-
-
-
-
1
U1194A
±1.25 A
±1.85 A
-
-
±12.5 A
±18.5 A
±1.25 A
±12.5 A