Operation Notes; Power Up Sequence; Power Down Sequence - GDC STANDALONE INTEGRATED MEDIA BLOCK SR-1000 User Manual

Hide thumbs Also See for STANDALONE INTEGRATED MEDIA BLOCK SR-1000:
Table of Contents

Advertisement

8. OPERATION NOTES

8 OPERATION NOTES

8.1 Power Up Sequence

Always power up any external storage before powering up the Projector. The external
storage must be powered up first to be correctly identified by the SR-1000.

8.2 Power Down Sequence

Always power down the SR-1000 and Projector with the following steps:
1. Power down the SR-1000 by using the
2. Power down the Projector after the SR-1000 is powered down.
3. Power down any external storage attached to the SR-1000.
User Manual for SR-1000 Standalone Integrated Media Block™
Shutdown
button on the Dashboard.
- 89 -
th
September 15
, 2019

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents