NAiS FP0 Series Hardware Manual page 118

Hide thumbs Also See for FP0 Series:
Table of Contents

Advertisement

Wiring
7.2
Wiring the Power Supply to the Control Unit
D Isolate the wiring systems to the FP0, input/output devices,
and motor devices.
Circuit breaker
D The power supply sequence should be set up so that power to
the control unit is turned OFF before the input/output power
supplies.
D If the input/output power supplies are turned OFF before the
power to the control unit, the FP0 control unit may detect a
drop in the input level, and malfunction.
D Be sure to supply power to a control unit and an expansion
unit from the same power supply, and turn the power ON and
OFF simultaneously for both.
7 - 6
Motor
devices
Insulated
I/O
DC
power
devices
supply
Insulated
DC
FP0
power
supply
Matsushita Automation Controls
FP0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents