Fujitsu Waterstage WOYG160LJL Installation Manual page 57

Air to water heat pump split single service, refrigerant r410a inverter, outdoor/hydraulic unit
Hide thumbs Also See for Waterstage WOYG160LJL:
Table of Contents

Advertisement

Line
Function
Domestic hot water
If the installation is fitted with the DHW kit.
1600
U
Operating mode
U
Nominal setpoint
1610
The backup electrical system is required to reach this level.
1612
U
Reduced setting
1620
I
Release of DHW load
24h / day: The temperature of the DHW is constantly maintained at the DHW comfort setting.
Heating circuit time programme: The DHW is produced according to the programming for the ambient temperature
(with 1 hour in advance when switched on).
Programme 4 / DHW: The DHW programme is separate form the heating circuit programme.
Off-peak tariff* : The electrical backup heating is only authorised to operate during the off-peak period.
T'prog 4/DHW or low-tariff *: The electrical backup heating is authorised to operate during the comfort period or off peak.
* - Connect the "Power Provider" contact to input EX2 (see
the electric back-ups for the DHW tank are subject to the power supplier's tariffs. Switching on the electric back-up for
the DHW tank is only authorised during off-peak hours.
I
1640
Legionella function
I
1641
Legionella function periodically
1642
S
Legionella function weekday
S
Legionella funct time
1644
S
1645
Legionella funct setpoint
1646
S
Legionella funct duration
S
1647
Legionella funct circ pump
1660
S
Circulating pump release
Swimming pool (Only with swimming pool kit option)
U
Setpoint solar heating
2055
2056
U
Setpoint source heating
2057
S
Swi diff source heating
S
2065
Charging priority solar
2080
S
With solar integration
Waterstage / Installation / 2011 - EN
Setting range
or display
Off, On, Eco
Reduced setpoint (line 1612)...
65 °C
8 °C...
Nominal setting (line 1610)
24h / day
Heating circuit time programme
Programme 4 / DHW
Off-peak tariff (Off-peak)
Programme 4 / DHW
and Off-peak
fig. 36, page
43). In the case of a day /night contract,
Off, Periodically (depending line setting 1641),
Fixed weekday (depending line setting 1642)
1 to 7
Monday, Tuesday,...
Off, On
Time program 3/HCP, DHW release,
Time program 4/DHW, Time program 5
8... 80 °C
8... 35 °C
0.5... 3 °C
Priority 1, Priority 2, Priority 3
No, Yes
Setting
Basic
increment
setting
On
1
55 °C
1
40 °C
Programme
4 / DHW
Off
1 day
7
Saturday
Off
DHW release
26 °C
22 °C
0.5 °C
Priority 1
Yes
- 57 -

Advertisement

Table of Contents
loading

Table of Contents