Filling The Installation With Gas; If The Outdoor Temperature Is Below +10°C; Triple Evacuation Method; Method For Calibrating And Checking A Vacuum Pump - Fujitsu Waterstage WOYG160LJL Installation Manual

Air to water heat pump split single service, refrigerant r410a inverter, outdoor/hydraulic unit
Hide thumbs Also See for Waterstage WOYG160LJL:
Table of Contents

Advertisement

Filling the installation with gas

This operation is reserved for installers familiar with the legislation for handling refrigerants.
Creating a vacuum with a calibrated vacuum pump is essential (see APPENDIX 1).
Never use equipment used previously with any refrigerant other than a HFC.
Only remove the refrigeration circuit caps when performing the refrigeration connections.
If the outdoor temperature is below +10°C:
- You must use the triple evacuation method
(see APPENDIX 2).
- We recommend installing a dehydrator filter
(and this is highly recommended if the outdoor
temperature is below +5°C).
APPENDIX 1
Method for calibrating and checking a vacuum
pump
- Check the vacuum pump's oil level.
- Connect the vacuum pump
to the vacuum gauge as
shown in the diagram.
- Pump down for 3 minutes.
- After 3 minutes, the pump
reaches its threshold vacuum limit and the vacuum
gauge's needle stops moving.
- Compare the obtained pressure value against the
table of values. Depending on the temperature, this
pressure should be lower than that shown in the
table.
=> If this is not the case, replace the gasket, hose
or pump.
T °C
5°C<T<10°C
Pmax
- bar
0.009
- mbar
9
- 26 -
Vacuum
gauge
Vacuomètre
Flexible
Plugged
hose
bouché
Pompe
Vacuum
pump
à vide
10°C<T<15°C
15°C < T
0.015
0.020
15
20
APPENDIX 2

Triple Evacuation Method

- Connect the Manifold high-pressure hose to the
filling hole (gas connection). A valve must be fitted
to the vacuum pump's hose so you can shut it off.
a) Create a vacuum until the desired value is
reached and maintain this value for 30 mins
(see table in APPENDIX 1),
Set of pressure gauges
Jeu de manomètres
(Manifold)
(Manifold)
High
Low
Basse
Haute
Lo
Hi
Pressure
pression
pression
Pressure
Connection
Liaison...
OU
UE
Liquid
liquide
gaz
Gas
b) Switch off the vacuum pump, close the valve at
the end of the service hose (yellow), connect this
hose to the expansion valve on the nitrogen bottle,
fill to 2 bar, close the hose's valve again,
High
Haute
Lo
Hi
Pressure
pression
Liaison...
Connection
OU
UE
Liquid
liquide
gaz
Gas
c) Connect this hose to the vacuum pump again,
switch it on and slowly open the hose's valve.
Haute
High
Lo
Hi
Pressure
pression
Liaison...
Connection
OU
UE
Liquid
liquide
gaz
Gas
d) Repeat this operation at least three times.
Remember: performing these operations using
refrigerant is strictly prohibited.
Waterstage / Installation / 2011 - EN
Vacuum
Vacuomètre
Gauge
HIU
MH
Vacuum pump
Pompe à vide
Nitrogen
Azote
HIU
MH
HIU
MH

Advertisement

Table of Contents
loading

Table of Contents