Adjusting Mount Extension; Installing Cable Covers - PEERLESS PRS-EXA Installation And Assembly Manual

Projector ceiling/wall mount
Hide thumbs Also See for PRS-EXA:
Table of Contents

Advertisement

Adjusting Mount Extension

While supporting the weight of the projector, loosen clamp plate screws half a turn and position projector to the
11
desired extended position. Retighten clamp plate screws securely.
• On ceiling installations, clamp plate adjustment screws support weight of projector when fully tightened. Weight of the
projector will need to be supported if clamp plate screws are loosened.
CEILING INSTALLATION
CLAMP PLATE
SCREWS
Install Cable Covers
Cut cable covers (LL) to the length of inner channel (CC) and outer channel (BB) openings, leaving space for cables if
12
routed through channels. Snap cable covers (LL) into openings as shown.
CEILING INSTALLATION
LL
BB
CUT TO
LENGTH OF
OPENING
CC
Visit the Peerless Web Site at www.peerlessmounts.com
WARNING
WALL INSTALLATION
(EXCEPT FOR EXC MODELS)
DD
WALL INSTALLATION
(EXCEPT FOR EXC MODELS)
LL
CUT TO
LENGTH OF
OPENING
CABLES
13 of 13
All other brand and product names are trademarks or registered trademarks of their respective owners.
CLAMP PLATE
SCREWS
LL
CUT TO
LENGTH OF
OPENING
BB
CC
ISSUED: 04-24-08 SHEET #: 055-9256-1
For customer care call 1-800-865-2112 or 708-865-8870.
© 2008, Peerless Industries, Inc. All rights reserved.
DD
LL
CUT TO
LENGTH OF
OPENING
CABLES

Advertisement

Table of Contents
loading

Table of Contents