Download Print this page

Flush Mount Application - PEERLESS PE 1120 Installation And Assembly Manual

Projector enclosure

Advertisement

Flush Mount Application

• Make sure that the supporting surface will safely support the combined load of the equipment and all attached hard-
ware and components.
Remove M5 penta pin screws from top plates (B).
1
B
Note: Refer to projector mount instruction sheet for attachment of projector mount to ceiling.
1-2
Following projector mount instructions for flush mount applications, attach projector mount to ceiling through slots
indicated in figure 1.2.
WARNING
M5 PENTA PIN
SCREW
B
PROJECTOR
MOUNT
1-1
Attach top plates (B) to ceiling using outer holes
indicated in figure 1.1.
Note: It is the responsibility of the installer to
provide fasteners appropriate for the mounting
surface.
B
CEILING
fig 1.2
6 of 7
CEILING
fig 1.1
ISSUED: 07-11-06 SHEET #: 055-9462-1

Advertisement

loading

This manual is also suitable for:

Pe 1120-w