Adjusting Mount Extension
While supporting the weight of the projector, loosen clamp plate screws half a turn and position projector to the
7
desired extended position. Retighten clamp plate screws securely.
• On ceiling installations, clamp plate adjustment screws support weight of projector when fully tightened. Weight of the
projector will need to be supported if clamp plate screws are loosened.
CEILING INSTALLATION
CLAMP PLATE
SCREWS
Install Cable Covers
Cut cable covers (Q) to the length of inner channel (C) and outer channel (B) openings, leaving space for cables if
8
routed through channels. Snap cable covers (Q) into openings as shown.
CEILING INSTALLATION
Q
B
CUT TO
LENGTH OF
OPENING
C
Visit the Peerless Web Site at www.peerlessmounts.com
WARNING
WALL INSTALLATION
(EXCEPT FOR EXC MODELS)
D
WALL INSTALLATION
(EXCEPT FOR EXC MODELS)
Q
CUT TO
LENGTH OF
OPENING
CABLES
10 of 11
CLAMP PLATE
SCREWS
Q
CUT TO
LENGTH OF
OPENING
B
C
ISSUED: 1-11-08 SHEET #: 055-9495-2 10-16-08
For customer care call 1-800-865-2112 or 708-865-8870.
D
Q
CUT TO
LENGTH OF
OPENING
CABLES