Before Installation; Installation Regulations; Choice Of The Location; Data Plate - DeDietrich C 330 Series Installation, User And Service Manual

High-efficiency floor-standing boiler
Table of Contents

Advertisement

5

Before installation

5.1

Installation regulations

5.2

Choice of the location

Fig.6
Position of data plate
7600532 - v.11 - 13122018
Warning
The boiler must be installed by a qualified installer in accordance
with local and national regulations.
5.2.1

Data plate

The identification plate is located behind the boiler casing on the frame,
near the syphon connection. The data plate provides important information
on the boiler specifications such as the model and the device category.
AD-0000487-01
5.2.2

Installing the boiler C 330 ECO

Use the guidelines and the required installation space as a basis for
determining the correct place to install the boiler.
When determining the correct installation area, take account of the
permitted position of the flue gas outlet and/or air supply outlet.
Ensure that there is sufficient space around the boiler for good access
and ease of maintenance.
A technical clearance of at least 80 cm is required at the front (service
side) of the boiler. However, we recommend that the clearance is at
least 100 cm. Above the boiler, we recommend a clearance of at least
40 cm (when using an air inlet filter, the clearance must be at least 65
cm). A minimum of 30 cm is required on the side of the flue gas outlet,
and a minimum of 30 cm is also required on the other side (or 80 cm, if
this is operating side).
5 Before installation
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents