5 Before installation
Fig.7
Left-hand and right-hand versions
I
L
Fig.8
Position of the adjustment bolts
663
55
55
531
24
Danger
It is forbidden to store, even temporarily, combustible products
and substances in or near the boiler.
Caution
L Left-hand version
R Right-hand version
I Inspection trap (service side)
The service side with the inspection trap on the heat exchanger is
considered to be the front of the boiler. The boiler is available in both a
'left-hand' and 'right-hand' version. This means that the hydraulic
connections and the flue gas discharge are situated on either the left or
the right-hand side of the boiler. The control panel is on the front as
standard, but can easily be rotated so that it is on the short side.
I
R
AD-0000515-01
The adjustment bolts must be used to make the boiler level and to raise
the wheels off the floor. Turn the adjustment bolts outwards as soon as the
21,5
boiler is placed in the correct position. The figure shows the support
surface of the boiler (this is the position of the adjustment bolts).
55
Tab.14
C 330 ECO
280
350
430
500
570
650
55
87,5
AD-0000486-01
The boiler must be installed in a frost-free area.
An earthed electrical connection must be available close to the
boiler.
A connection to the drain must be present for the condensate
drain close to the boiler.
Dimensions A (mm)
A (mm)
723
723
723
1032
1032
1032