Transport - DeDietrich C 330 Series Installation, User And Service Manual

High-efficiency floor-standing boiler
Table of Contents

Advertisement

5 Before installation
Fig.13
Rotating the control panel
2
1
4
90º
5
8
2x
7
5.3

Transport

Fig.14
Boiler package
L
28
1. Unscrew the 4 lateral retaining screws in the control panel.
2. Remove the protective cover.
3. Unscrew the 2 bottom plate screws.
4. Lift up the control panel with the bottom plate.
5. Turn the control panel and the bottom plate into position on the short
6. Slide the lips of the bottom plate into the appropriate slots.
7. Tighten the 2 bottom plate screws.
8. Replace the protective cover.
9. Tighten the 4 lateral retaining screws again.
3 2x
9
6
AD-0000523-01
Tab.16
C 330 ECO
280
350
430
500
570
650
1789
800
The boiler is supplied fully assembled on a pallet. See the diagram and
table for the dimensions. The base of the package is a pallet 80 cm wide.
AD-0000519-01
This means that it can be transported with a pallet truck or using four-
wheel transport boards. Without the packaging, the boiler is 720 mm wide,
side.
Boiler package dimensions
Important
For work on the C 630 ECO boilers: The features and instructions
described apply to each boiler module.
L (mm)
1920
1920
1920
2230
2230
2230
7600532 - v.11 - 13122018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents