Final Instructions - DeDietrich C 330 Series Installation, User And Service Manual

High-efficiency floor-standing boiler
Table of Contents

Advertisement

7 Commissioning
7.4

Final instructions

Fig.62
Example filled-in sticker
Adjusted for / Réglée pour /
Ingesteld op / Eingestellt auf
/ Regolato per / Ajustado
para / Ρυθμισμένο για /
Nastawiony na / настроен
для / Reglat pentru /
настроен за / ayarlanmıştır /
Nastavljen za / beállítva/
Nastaveno pro / Asetettu
kaasulle / Justert for/
indstillet til/ ‫: ل طبض‬
G20
Gas
20
mbar
C
(10)3(X)
C
(12)3(X)
Fig.63
Position of the documentation folder
2
1
54
Parameters / Paramètres /
Parameter / Parametri /
Parámetros / Παράμετροι /
Parametry / Параметры /
Parametrii / Параметри /
Parametreler / Paraméterek
/ Parametrit / Parametere /
Parametre / ‫: تاملعملا‬
DP003 - 3300
GP007 - 3300
GP008 - 2150
GP009 -
AD-3001124-01
AD-0000520-01
1. Remove the measuring equipment.
2. Screw the cap on to the flue gas measuring point.
3. Seal the gas valve unit.
4. If installed: check the setting of the Gps minimum gas pressure switch.
The pressure switch must be set at 10 mbar.
5. If installed: check the setting of the minimum gas pressure switch for
Vps gas leakage control. The pressure switch must be set at 50% of
the supply pressure (maximum 40 bar).
6. Reattach the casing to the inspection side.
7. Briefly press the
status.
8. Heat the CH system up to approximately 70 °C.
9. Switch the boiler off.
10. Vent the central heating system after approx. 10 minutes.
11. Turn on the boiler.
12. Check the water pressure. If necessary, top up the central heating
system.
13. Fill in the following data on the sticker included, and attach it next to
the data plate on the appliance.
The gas type;
The gas supply pressure;
If set to overpressure application, fill in the type;
The parameters modified for the changes mentioned above.
14. Inform the user of the maintenance to be performed.
15. Hand over all manuals to the user. A documentation folder can be
found in the frame of the boiler. Use it to store all boiler manuals
together with other documents relating to the installation
16. Confirm the commissioning with a signature and a company stamp.
The boiler is now ready for operation.
For more information, see
Connecting the gas leakage control (VPS), page 47
key to return the boiler to the normal operating
7600532 - v.11 - 13122018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents