Download Print this page

Altronix ACM4 Installation Manual page 9

Sub-assembly
Hide thumbs Also See for ACM4:

Advertisement

Installation Instructions for Maximal (BC800 Enclosure):
1. Fasten standoffs onto metal pems configuration (A) or configuration (B) of enclosure depending on the
sub-assembly module (Fig. 8, pg. 9). ACM8(CB) modules can only be installed in the middle or bottom
mounting positions of the Maximal enclosure.
2. Position sub-assembly module over corresponding standoffs and secure module into enclosure with four (4)
pan head screws supplied (Fig. 8a, pg. 9).
3. Refer to the Maximal Access Power Controllers Installation Guides for: Maximal 3/5/7,
Maximal 3D/5D/7D, Maximal 3F/5F/7F, Maximal 3FD/5FDFD, Maximal 11/33/55/75/77,
Maximal 11D/33D/55D/75D/77D, Maximal 11F/33F/55F/75F/77F,
Maximal 11FD/33FD/55FD/75FD/77FD (Pgs. 20-21).
Refer to the Maximal Expandable Power Systems Installation Guides for:
Maximal 11E/13E/33E/35E/37E/55E/75E/77E,
Maximal 11FE/FE/33FE/35FE/37FE/55FE/75FE/77FE (Pg. 22),
and individual Sub-Assembly Installation Guides for the following models: LINQ8PD(CB), ACM4(CB),
LINQ2, MOM5, PD4UL(CB), PD8UL(CB), PD16W(CB), PDS8(CB), ACM8(CB), ACMS8(CB), VR6
for further installation instructions.
Sub-Assembly Position Chart for the Following Models:
Maximal Access Power Controller and Maximal Expandable Power Systems (refer to instruction #3 above).
Sub-Assembly
Module
LINQ8PD(CB)
ACM4(CB)
MOM5
PD4UL(CB)
PD8UL(CB)
PD16W(CB)
PDS8(CB)
VR6
ACM8(CB)
ACMS8(CB)
LINQ2*
* LINQ2 can be installed when utilizing
eFlow power supply/charger boards.
Fig. 8a
Pan Head
Screw
Sub Assembly
Sub-Assembly
Mounting
Position
Top, Middle
& Bottom
Middle & Bottom
Edge of Divider
Pem
Standoff
Enclosure
Mounting
A
B
C
A
Top
C
B
A
Middle
B A
Bottom
Fig. 8
- 9 -

Advertisement

loading