Vertiv NetSure 7100 Series Installation Manual page 31

48v dc power system
Hide thumbs Also See for NetSure 7100 Series:
Table of Contents

Advertisement

Figure 14:
IB2 Controller Interface Board Switch Location and Setting
IB2 (Interface Board)
(Top View)
Figure 15:
Optional EIB Controller Extended Interface Board Switch Location and Setting
EIB
(Extended Interface Board)
(Top View)
J9
J8
J7
SW1
1
2
OFF
ON
SW1
SW1
OFF
Vertiv
| NetSure 7100 Series Installation Manual (IM582127000100) | Rev. H
1 2
OFF
J6
J5
1
Setting
2
EIB-1
ON
IB2 (Interface Board)
Switch SW1 is located in
this corner of the IB2 Board.
SW1
Setting
ON
IB2-1
1 2
EIB
(Extended Interface Board)
Switch SW1 is located in
this corner of the EIB Board.
DIP Switch SW1
1
2
OFF
OFF
DIP Switch SW1
1
2
OFF
OFF
31

Advertisement

Table of Contents
loading

Table of Contents