Connecting
5.5 Sensor Wiring
5.5
Sensor Wiring
5.5.1
Wiring the Sensors
1. Using a flat blade screwdriver loosen the six securing screws and open the transmitter
2. Observing the upstream and downstream orientation, attach the UP (upstream) and DN
3. Close top cover and tighten securing screws.
56
top cover.
(downstream) cables to the sensors and make snug. Thread cables through case gland
and attach the other ends to the UP and DN terminals of the transmitter (see figure
below).
①
To Downstream Sensor
②
To Upstream Sensor
Figure 5-26
Connecting Sensor Cables to Transmitter
FST020 IP65 NEMA 4X
Operating Instructions, 02/2012, A5E03086487-05