Electrical Installation; Power Connections - GE AF-650 GP Operating Instructions Manual

General purpose drive high power 460/575/690v 125hp and above
Hide thumbs Also See for AF-650 GP:
Table of Contents

Advertisement

Installation
AF-650 GP High Power Operating Instructions

3.4 Electrical Installation

3.4.1 Power Connections

3
3
Cabling and Fusing
NOTE
Cables General
All cabling must comply with national and local
regulations on cable cross-sections and ambient
temperature. Copper (75°C) conductors are recommended.
The power cable connections are situated as shown below.
Dimensioning of cable cross section must be done in
accordance with the current ratings and local legislation.
See the Specifications section for details.
For protection please see fuse in the tables of the fuse
section. Always ensure that proper fusing is made
according to local regulation.
NOTE
Use a screened/armoured motor cable to comply with EMC
emission specifications. For more information, see EMC
specifications in the Design Guide.
See section General Specifications for correct dimensioning
of motor cable cross-section and length.
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents