Download Print this page

Leica Geosystems TPS700 Series User Manual page 52

Advertisement

Exercise 6: Field to Finish,
TPS 700auto – 3-Steps to Productivity
Exercises
Step
7
Notice that the Set Job selection has a diamond in
front of it.
has been completed.
once you've been through it.
Now select (2) Set Station.The Set Station screen is
displayed.
8
The Station is the point you are occupying.
point number, an Instrument Height (the measure up or
height of the instrument over the point) and some
arbitrary coordinates for the occupied point for this
exercise.
are returned back to the Set Orientation screen.
Note:
If you have input or uploaded your control
points, you can pull your Station point up from the
Fixed Points, where your control and stake out points
are stored.
9
Select (3) Set Orientation.
is displayed.
10
You can specify a Backsight point number, type in a
BS Bearing, or set the Backsight circle to zero.
For this exercise we will set the circle to zero.
Just select <Hz0>, then Enter.
Enter, to set the orientation.
The Surveying Start Up screen is once again
displayed.
11
Select (4) Start to begin Surveying.
Measure screen is displayed.
12
Note the display in the upper right hand corner of
the screen: 1/3.
You will remember that 1/3 means there are 3 pages on
this selection.
For our exercise, we want to access our Codelist.
Press SHIFT, then Pg Dn to display page 2/3.
Continued
Action
This signifies that the Set Job task
Each step is marked complete
Then, select <SET> to Set the Station.
More on that in the next section.
Enter a
The Orientation screen
Finally, <SET> and
The Surveying
Continued on next page
Dec, 2001
Page 21/27
We

Advertisement

loading

This manual is also suitable for:

Tps700auto