Download Print this page

Step 2: Surveying - Leica Geosystems TPS700 Series User Manual

Advertisement

Step 2: Surveying

Exercise 1: Making some measurements
Introductio
The purpose of the exercise is to see what your TPS700auto can do. Set your
n
instrument up outdoors. If possible, have someone carry a prism and pole for you.
You will need a watch.
Measuring
To get a feel for ATR, Automatic Target Recognition, follow the procedures below.
with ATR
Record your times here:
Total Time for 10
TPS 700auto – 3-Steps to Productivity
Exercises
Step
1
Setup the instrument up and level it.
2
Turn the instrument on. The Measure and Record screen is displayed.
3
In the Measure and Record Screen, enter a point ID, then press Enter.
4
Using your rodman, manually locate 10 points about 100 feet from the
instrument:
Mark the Start time when the rodman is on the first point.
Manually place the crosshairs on the target at each point, as
you would normally.
Then press the DIST key.
After locating the last point, record the Finish time
Record your Start and Finish times in the table, below.
Start Time
Finish Time
Points
Action
Manual Pointing
Continued on next page
Dec, 2001
Page 7/27

Advertisement

loading

This manual is also suitable for:

Tps700auto