Download Print this page

Leica Geosystems TPS700 Series User Manual page 51

Advertisement

Exercise 6: Field to Finish
Introductio
Now we're ready to go to the field.
area that will give you enough room to locate 20 to 30 points.
n
Bring the instructions, below, with you to the field.
TPS 700auto – 3-Steps to Productivity
Exercises
Step
1
Once you have set up the instrument, from the Measure
and Record Screen, press the PROG button.
Program Menu is displayed.
2
Select (1) Surveying, press Enter.
screen is displayed.
3
The Surveying screen shows 4 steps:
1. Set Job
2. Set Station
3. Set Orientation
4. Start
Note:
This is called the Start Up screen.
onboard application program has a Start Up
screen.
You must perform each of the operations, one through
four, in the Start Up screen.
instrument is properly oriented prior to accessing
the application.
Once you've oriented the instrument in one
application, the Start Up screen in other
applications will recognize this, so, once you have a
good set up, you don't have to set up over and over
again.
4
Select (1) Select Job.
displayed.
5
Use the arrow keys to select <NEW>, press the Enter
key.
The Create New Job screen is displayed.
6
To create a new Job:
1. Use the Arrow keys to the Job field
2. Press the SHIFT key to change to the alpha
entry mode
3. Type " Leica " for the Job name.
work just like the keys on a cell phone.
4. Press Enter after you have typed in the new Job
name.
5. The remaining fields are optional.
6. Use the Arrow keys to select <SET>, then Enter.
The Surveying Start Up screen is displayed again.
Set the instrument up in
Action
The Surveying
This ensures that the
The Select Job screen is
The alpha keys
Continued on next page
The
Each
Dec, 2001
Page 20/27

Advertisement

loading

This manual is also suitable for:

Tps700auto