Mandik FDMC General Information Manual page 16

Hide thumbs Also See for FDMC:
Table of Contents

Advertisement

Fig. 18
Solid ceiling construction - mortar or gypsum
POSITION:
1
Fire damper FDMC
2
Solid ceiling construction
3
Mortar or gypsum
4
Duct
Fig. 19
Solid ceiling construction - stuffing box and fire protection mastic
≥ 50
4
POSITION:
1
Fire damper FDMC
2
Solid ceiling construction
3
Mineral stone wool min. density 140 kg/m
4
Fire protection mastic min. thickness 1 mm
5
Glass fiber felt with aluminium foil width 50 mm, thickness 5 mm
6
Duct
Used materials - example**:
2 - Promapyr, Rockwool Steprock HD
3 - Promastop - P, K
3
150*
≥ 40
* min. 110 - Concrete/ min. 125 - Aerated concrete
≥ 40
150*
3
* min. 110 - Concrete/ min. 125 - Aerated concrete
3
** Stuffing box and fire protection mastic can be replaced by another approved
fire sealing system for damper installation with equivalent material properties.
4
1
5
15
TPM 083/12
EIS 60
2
EIS 60
6
2
1

Advertisement

Table of Contents
loading

Table of Contents