Cedex Bio System
Initialize ISE unit
Operator time
Prerequisites
Tools and materials required
Roche Diagnostics
Operator's Manual · Version 3.1
f
Utilities > Maintenance > Initialize ISE Unit
Initializing the ISE unit uses Activator to condition the electrodes and to adjust the
sensors and the pump action. This ensures proper transportation of fluids through
the ISE tubing.
Approximately 3 minutes.
The system must be in Standby status.
m Activator
Make sure that you have read and understood section Safety information on page E-42.
The following warning messages in particular are relevant:
o
Infection by biohazardous materials on page E-42.
a To initialize the ISE unit
1 Select the maintenance action Initialize ISE Unit.
2 Press
.
The maintenance definition screen is displayed.
3 Press
to start the action.
A placement list is displayed.
4 Place the Activator on the sample area positions indicated on the screen.
5 Press
to confirm the placement and to start the action.
A message will inform you when the maintenance action is complete.
6 Remove the Activator from the sample area.
7 Press
.
14 ISE maintenance
ISE maintenance actions
E-53
Need help?
Do you have a question about the Cedex Bio System and is the answer not in the manual?