Cedex Bio System
Defining the processing order
Roche Diagnostics
Operator's Manual · Version 3.1
4 Press
.
The application data are deleted.
For a given sample, the tests are processed in the order defined by the time required
to perform the tests (number of cycles), starting with the one that takes the longest.
This order can be altered manually by defining a specific process sequence list.
a To define the processing sequence
1 Choose Utilities > Applications > Process Sequence.
2 In the Default list, select a test you want to be processed with high priority.
3 Press
to move it to the Priority list.
The tests are processed in the order displayed in this list. When the tests
contained in this list are processed, the rest of the tests are processed in the
normal order.
4 Perform steps 2 and 3 to move the other tests you want to process with high
priority.
5 To move a test from the Priority to the Default list, select the test in the Priority
list and press
6 In the Priority list, select a test and use
the list.
7 Press
to save the processing sequence.
The processing sequence defined in the Priority list applies to all tests performed on
the current Cedex Bio instrument.
. To move all tests to the Default lists, press
7 Configuration
.
and
to move it up and down in
Applications
B-145
Need help?
Do you have a question about the Cedex Bio System and is the answer not in the manual?